{"id":262916,"date":"2026-04-20T14:49:50","date_gmt":"2026-04-20T06:49:50","guid":{"rendered":"https:\/\/wonderful-indigo-elk.62-72-47-242.cpanel.site\/doe-expands-opportunities-for-renewable-energy-investments-in-mindanao\/"},"modified":"2026-04-20T14:49:50","modified_gmt":"2026-04-20T06:49:50","slug":"doe-expands-opportunities-for-renewable-energy-investments-in-mindanao","status":"publish","type":"post","link":"https:\/\/uptownmanila.com\/?p=262916","title":{"rendered":"DOE Expands Opportunities For Renewable Energy Investments In Mindanao"},"content":{"rendered":"<p>The Department of Energy (DOE) will launch the seventh round of the Green Energy Auction (GEA-7) this year as part of government efforts to accelerate renewable energy (RE) deployment, especially in Mindanao.<\/p>\n<p>According to the DOE, the Terms of Reference (TOR) for GEA-7 is expected to be released by the second quarter of the year.<\/p>\n<p>&#8220;GEA-7 will offer renewable energy capacities nationwide, with a strategic and significantly increased allocation for Mindanao, estimated at approximately five times the capacity offered in previous auction rounds,&#8221; the DOE said in a statement Friday.<\/p>\n<p>The DOE added the auction is part of its efforts to stimulate investments in Mindanao, address growing energy demand, and promote a more balanced and resilient power system across the country.<\/p>\n<p>The auction will cover solar rooftop, ground-mounted solar, and floating solar technologies.<\/p>\n<p>Projects for solar rooftop and ground-mounted installations are targeted to commence delivery in 2027, while floating solar projects are scheduled for delivery between 2027 and 2029.<\/p>\n<p>The DOE said the floating solar component will also incorporate the unsubscribed capacities from the fourth Green Energy Auction (GEA-4), ensuring efficient utilization of previously allocated capacity.<\/p>\n<p>To further enhance grid stability and reliability, the DOE will require all ground-mounted solar projects under GEA-7 to be integrated with battery energy storage systems.<\/p>\n<p>&#8220;This requirement is expected to improve dispatchability and address the intermittency of solar energy, supporting a more secure and flexible power system,&#8221; the DOE said.<\/p>\n<p>The DOE urged interested renewable energy developers to participate in GEA-7 and register their projects, noting that early registration is crucial to ensure project eligibility and qualification for the upcoming auction. (PNA)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>GEA-7 will help boost clean energy capacity and infrastructure.<\/p>\n","protected":false},"author":71,"featured_media":262917,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15011],"tags":[],"class_list":["post-262916","post","type-post","status-publish","format-standard","has-post-thumbnail","category-greeninc"],"zyndk8_nxtgen_metadata":{"nxtgen_comments":[{"8804":"nice step for sustainability \ud83d\udcaf\r","8805":"good direction \ud83d\udc4d\r","8806":"prang ok nmn pero challenging \ud83e\udd14\r"}]},"_links":{"self":[{"href":"https:\/\/uptownmanila.com\/index.php?rest_route=\/wp\/v2\/posts\/262916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uptownmanila.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/uptownmanila.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/uptownmanila.com\/index.php?rest_route=\/wp\/v2\/users\/71"}],"replies":[{"embeddable":true,"href":"https:\/\/uptownmanila.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=262916"}],"version-history":[{"count":0,"href":"https:\/\/uptownmanila.com\/index.php?rest_route=\/wp\/v2\/posts\/262916\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uptownmanila.com\/index.php?rest_route=\/wp\/v2\/media\/262917"}],"wp:attachment":[{"href":"https:\/\/uptownmanila.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=262916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/uptownmanila.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=262916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/uptownmanila.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=262916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}